Bridge over the river Olt on DJ 131 at km 7+366, Aita Mare, county Covasna
Client | County Counsil Covasna |
Total length | 36,25 + 36,50 + 36,25 total 109,00 m |
Planning period | 2010, 2013 – 2014 |
Planning period | project planning: feasibility study, technical project, detailed design structural design |
The final design includes an integral bridge with BFT (BetonFertigTeil – Prefabricated prestressed concrete beam) superstructure.