Bridge structures, overpasses and underpasses on the highway Orăştie – The VFT solution

Total length 39,00 m

 

Both structures are motorway overpasses for two lane roads, each using four prefabricated steel-concrete composite beams PreCoBeams for the superstructure. The steel-concrete shear transmission is made through composite dowels and no upper flanges of the steel girders in the field area are needed. The overpasses are skew, at a degree of 69°.

 

Back