• New railway line Wendlingen-Ulm, tunnel Albaufstieg/excavation pit Pfaffenäcker
    New railway line Wendlingen-Ulm, tunnel Albaufstieg/excavation pit Pfaffenäcker
  • Berlin Underground U5 - Track switching system/TBM in direction of travel
    Berlin Underground U5 - Track switching system/TBM in direction of travel
  • Berlin Underground U5 - station "Unter den Linden"/cover reinforcement
    Berlin Underground U5 - station "Unter den Linden"/cover reinforcement
  • Motorways A 9 / A 4 - conversion of interchange Hermsdorfer Kreuz
    Motorways A 9 / A 4 - conversion of interchange Hermsdorfer Kreuz
  • Tunnel Aubing/motorway ring Munich
    Tunnel Aubing/motorway ring Munich
  • Noise barrier Freimann - inner-urban area/Munich
    Noise barrier Freimann - inner-urban area/Munich
  • Lufthansa maintenance hall/Munich Airport
    Lufthansa maintenance hall/Munich Airport
  • EXPO 2010 Shanghai - German Pavilion/China
    EXPO 2010 Shanghai - German Pavilion/China
  • New railway line Nuremberg-Ingolstadt/bridge over the Main-Danube Canal
    New railway line Nuremberg-Ingolstadt/bridge over the Main-Danube Canal
  • Nijmegen Stadsbrug - assembly stage/Netherlands
    Nijmegen Stadsbrug - assembly stage/Netherlands
  • BMW Welt – event and delivery centre of BMW/Munich
    BMW Welt – event and delivery centre of BMW/Munich
  • 2nd crossing of Strelasund - Stralsund/isle of Rügen, insertion of steel hollow box segments
    2nd crossing of Strelasund - Stralsund/isle of Rügen, insertion of steel hollow box segments
  • Metro Algiers line 1 – expansion C/station "Des Ateliers"
    Metro Algiers line 1 – expansion C/station "Des Ateliers"
  • Metro Algiers line 1 – expansion C/terminus "Ain Naadja 2"
    Metro Algiers line 1 – expansion C/terminus "Ain Naadja 2"
  • Metro Algiers line 1 – expansion C/Algeria
    Metro Algiers line 1 – expansion C/Algeria
  • Baku Crystal Hall - Eurovision Song Contest 2012/Azerbaijan
    Baku Crystal Hall - Eurovision Song Contest 2012/Azerbaijan
  • Central Station Dresden/general renewal and conversion of station building
    Central Station Dresden/general renewal and conversion of station building
  • EXPO 2015 Milan - German Pavilion/Italy
    EXPO 2015 Milan - German Pavilion/Italy
  • National road B 16 - Danube Bridge Günzburg
    National road B 16 - Danube Bridge Günzburg
  • Motorway A 9, structure BW 13 / 02s flyover/interchange Neufahrn
    Motorway A 9, structure BW 13 / 02s flyover/interchange Neufahrn
  • Media house Schwäbischer Verlag/Ravensburg
    Media house Schwäbischer Verlag/Ravensburg
  • ICE train depot - new construction of vehicle hall with operational building/Leipzig
    ICE train depot - new construction of vehicle hall with operational building/Leipzig
  • Mobility and Transport Museum - Deutsches Museum/Munich
    Mobility and Transport Museum - Deutsches Museum/Munich
  • Munich Airport - connection terminal 2/circular bridges
    Munich Airport - connection terminal 2/circular bridges
  • Rhine foreland bridge Worms
    Rhine foreland bridge Worms

Together with our colleagues from the SSF group we offer our clients an interdisciplinary network of competent solutions. Relying on experience of over 40 years in designing and building outstanding civil and industrial edifices, we conceive representative bridges, research and implement new solutions for bridges, tunnels and transport infrastructure; performing structure verifications, feasibility and risk studies, designing modifications of buildings and buildings’ purposes respectively rehabilitations are also part of our core business.

Services

We offer high-quality, innovative, efficient, aesthetic and sustainable solutions

SSF-RO is a structural engineeering, expertising and consulting office, which was founded 2006 in Timişoara by the mother firm SSF Ingenieure AG Munich.

Our approach is driven by a commitment to high standards of quality, business ethics and client service, supported by a determination to provide cost-efficiency, sustainability, innovation, durability and aesthetic concept.

SSF-RO creates and develops solutions with leading-edge specialists and an in-depth understanding of the holistic process, resulting in the success of our clients’ complex construction projects.

Everything starts with dialogue

As result of our efforts to implement completly integrated solutions as added value for our customers, we have established, together with our business partners, a cooperation network and well-fuctioning working alliances.

28.01.2015

The pilot project Bridge Greisselbach is a new bridge concept including prefabricated carriageway...

Interactive visualization of the principle of  VTR®-Construction Method